October 24, 2026
What Is Changing in Returns Processing, and How I'm Keeping Up
By Adam Joerres
The Volume Problem Nobody Saw Coming
A few years ago, a slow week in returns meant a handful of pallets and a quiet afternoon to sort through them. That is not the job anymore. Online ordering changed how often people buy tech, and it changed how often they send it back. More volume means more pressure to move fast, and moving fast is exactly where mistakes used to happen.
What changed for me is not the work itself. It is the pace, and the amount of tracking that pace now demands.
From Paper Trails to Scanned Trails
I started in a system where a lot of the record-keeping happened on paper, or in spreadsheets someone updated by hand at the end of a shift. That worked fine when volume was low enough that one person could hold most of it in their head.
It does not work at the volume we see now. Every unit that comes through has to be scanned, logged, and tracked at each step, not because a rule says so but because there is no other way to know where something is once ten carts of returns are moving at once. Earlier in my career, I had to get comfortable with scanning tools and tracking software that didn't exist, or that I didn't need.
The upside is real. A scanned item is much harder to lose than a written one. The downside is that the margin for skipping a step has gotten smaller, not bigger, even though the volume has gone up.
What I Am Doing Differently
I spend more time now on the front end of a process than I used to. Before a new batch of returns moves through, I want the steps written down somewhere everyone can see them, not just understood by whoever trained longest. That sounds basic, but when a team is under volume pressure, people revert to habit, and habit is only good if it is the right habit.
I also check in more often on the people actually handling the product, not just the numbers at the end of the day. A report can tell me how many units moved. It cannot tell me that someone is rushing a step because they are behind, or that a new hire is unsure about a process nobody explained clearly. That only comes from walking the floor and asking.
Cross-Training Matters More Than It Used To
One thing I have leaned into is cross-training people across more than one part of the process. When volume spikes, a team that only knows one station gets stuck the moment that station backs up. A team where people can shift where they are needed absorbs the spike instead of buckling under it.
This is not a formal program, just something I push for because I have seen what happens without it. A slow day exposes nothing. A heavy day exposes every gap in how a team is cross-trained.
Carrying It Over From Construction
I manage on the construction side as well, and the lesson travels both ways. Materials get delivered, inspected, and tracked on a schedule, and the same problem shows up: more volume and tighter timelines mean the informal way of keeping track stops being good enough. A system that works for one job can fall apart on the next one if the scale changes and nobody adjusts how things get recorded.
Managing two different kinds of teams has taught me that the specifics change, but the underlying issue does not. Growth in volume eventually outruns an informal process. The question is whether you notice before it breaks something or after.
What I Tell People Who Ask
People newer to this kind of work sometimes ask me how to keep up when things speed up. My honest answer is that you cannot out-work a volume increase. You have to change how the work gets tracked and who can step into which role. Speed without structure just means faster mistakes.
The tools keep changing, and they probably will. What I try to hold onto is simpler: write the process down, check on the people doing it, and make sure more than one person can cover any given step. That part doesn't change no matter what system we use this year.